01

Kickoff Meeting & Project Planning

Once the project is awarded to lnter-build, a meeting is then initiated with our client to review the contract and schedule.

Simultaneously, our project management engineering & design team is assembled to provide support and coordination throughout the various phases of the project.

Final construction documents provided by our client are reviewed and analyzed by our staff.

Technical and structural design issues are brought forward to our client, consultants and architects.

02

Scope and Bid

We deemed this step to be essential and key to success for all our projects. Exchange of information and in depth discussion with our clients provides us a better idea of project’s needs and schedule requirements. We can determine the scope of work and provide our clients with an accurate bid and proposal.

03

Design

In collaboration with project engineer, architect and consultants, our design team uses 3D modeling software to design and frame all the Cold formed steel load bearing and wind bearing walls, selected floor and roof system. All required revisions and changes to the structural components of the projects is processed at this stage.

Our in house Engineers provide structural designs according to International Building Code, United States Building Code, National Building Code of Canada, and building codes for the Caribbean.

04

Shop Drawings

Shop drawings for cold formed steel walls,  floor systems, roof systems and other structural components are submitted for review and approval in preparation for fabrication and ordering of materials.

05

Fabrication

With an indoor controlled environment, lnterbuild is able to guarantee high quality control process on manufactured CFS wall panels. Each stud track, channel and other cold formed steel components labeled in correspondence with our CFS framing program. Our team uses these precisely cut tagged members to join the different components that makes up the assembly.

Ordered materials from other vendors are also inspected at our facility to ensure it conforms to standards and tolerances.

As fabrication proceeds, we coordinate with our client all shipping and ensure that site is prepared for their erection.

06

Installation

Using prefabricated wall panels, pre assembled roof truss and selected floor systems Interbuild can complete your project in a fraction of the time as wood/concrete frames. Wall Panel, Floor and Roof layout drawings are used for coordination by our on site erection team. This process ensures your shell structure to be built accurately and on schedule.

With our turn-key package, we coordinate and provide right personnel and equipment for erection of structural systems on site.

Next Prev